The construction practice builds the systems that hold an excavation, a foundation and a site boundary in place. Reliable support, careful sequencing, diligent execution and active supervision are the standard — especially where stability around a live site is non-negotiable.

Construction team reviewing work on an active building site

The problem this practice answers.

A sound drawing still fails if the excavation runs ahead of the support, if groundwater is treated as a surprise, or if nobody is watching movement. Construction is where stability is either kept or lost.

Capabilities

  • Shoring Construction

    Installation of excavation support systems with control over sequence, workmanship and site safety.

  • Deep Excavation Works

    Staged excavation for basements and substructures, kept inside a support system that is already doing its job.

  • Foundation Construction

    Construction of foundation elements coordinated with the ground, the design and the structure above.

  • Earth Retention Construction

    Building retaining and earth-retention systems that hold temporary and permanent level changes.

  • Slope Stabilization Works

    Site execution of stabilization measures for cuts, fills and unstable slopes.

  • Underground Construction

    Construction of buried and underground works where ground support and sequence control the outcome.

How Adey approaches the work.

  1. 01

    Start from an approved design and a sequence the site can actually follow.

  2. 02

    Install support, retention and foundations in the order the ground requires, not the order that looks fastest.

  3. 03

    Supervise the work against the design assumptions: ground, water, movement and workmanship.

  4. 04

    Keep safety and stability visible on site, including protection of neighbouring ground and structures.

Technical considerations

  • Excavation stages matched to installed support.
  • Workmanship at anchors, piles, walers, struts and facing.
  • Groundwater control and surface water during the works.
  • Monitoring where adjacent assets are sensitive.
  • Clear communication between the design engineer and the construction crew.

Consultation

Discuss Construction.

Tell us about the site, the structure and what has to stay stable. One conversation is enough to start.