Shoring and excavation with plant in the pit and at grade

Earth retention · Completed

Mixed-Use Building Retention

Location
Ethiopia
Configuration
Mixed-use building
Status
Completed
Category
Earth retention

Overview

Earth retention and excavation support for a mixed-use building, holding the site boundary while the basement and podium were constructed.

Scope

Scope covered earth-retention design coordination and construction of the support system associated with the building excavation.

Challenge

Mixed-use buildings often change level at the boundary. The wall has to serve the excavation first and the finished site afterwards.

Solution

Temporary support and permanent retention were planned as a sequence. Construction followed that handoff so the excavation never stood in for a finished wall.

Site record

Photographs of the excavation and shoring. Client names stay off the site.

Consultation

Discuss a similar project.

Tell us about the site, the structure and what has to stay stable. One conversation is enough to start.